Whether you operate a regional distribution network, manage transmission assets, or run generation infrastructure, pressure on network performance has never been higher. Our team bring the technical depth and track record to protect SAIDI performance and get more from capital programmes – across overhead lines, underground networks, substations, and everything in between that keeps them running.
A resilient network starts on the design desk. Our engineers deliver feasibility studies, load forecasting, capacity assessments, and constructible designs that account for what actually happens on the ground – not just what works on screen. From reticulation layouts to full substation and protection scheme design up to 110kV, we plan networks that perform today and carry future demand.
Delivering your capital programme on schedule starts well before crews arrive on site. We manage the full procurement cycle for your network – demand forecasting, strategic sourcing, and inventory management – so long-lead transformers, switchgear, and cable are on hand when your programme needs them, not on order when it’s too late.
Our field crews deliver across the full scope of network construction – 11kV to 66kV overhead lines, underground reticulation, and substation builds from civil works through to primary plant installation and secondary wiring. We work live-line where needed, with a modern crane-equipped fleet and rigorous safety governance, so your network stays in service while we build around it.
Our crews deliver street lighting and operational lighting as part of the same network programme – from photometric design and LED upgrades through to column installation and smart controls. Your lighting is designed alongside your electrical infrastructure, installed by crews already on site, and, if desired, maintained under the same contract.
We undertake and manage consistent planned maintenance and upgrades, using live-line crews so communities stay powered while we work. But when a cable fault hits, or a transformer goes down, your community feels it. Our teams respond with purpose-built diagnostic trucks and the VLF and TDR testing equipment needed to safely restore supply. With industry-leading levels of critical spares already on hand across our warehouses, the gear to fix the problem is ready to go – not weeks away on a shipping container.
Before any asset goes live, our technicians prove it’s safe and ready for the network. We run protection scheme testing and primary plant verification for assets from 400V through to 66kV, including IEC 61850-compliant digital substation environments. The result is full confidence in your infrastructure before it carries load.
Whether you’re planning a new build, upgrading existing assets, or need a team to maintain what’s already in the ground – get in touch and we’ll help you work out the best way forward.